top of page
  • col517

2024/25 Final Assessment Roll


2024-25 VSP Final Final Assessment Roll (03.02.24)
.pdf
Download PDF • 953KB

98 views

Recent Posts

See All

Repaving of HAR with drainage and Belgium blocks

Dear Residents of Harbor Acres, In what we hope will be a material improvement to Harbor Acres, the Village is about to embark on a repaving of HAR (from PW Blvd to the end cul-de-sac) with both a lot

bottom of page